Margin at risk on one project

A point estimate hides the tail. Enter a project's shape and watch the distribution — the expected margin, the p90 (bad-but-plausible) outcome, and a rough probability the project finishes underwater. This is a teaching model on transparent assumptions, and no forecast of your project. The audit starts with your baseline.

How wide the cost-to-complete could swing. Fixed-price delivery with scope drift often sits 30–60%.

The distribution

Expected margin

€40,000

16% of value

Probability of loss

12%

finishes below zero margin

p90 cost at completion

€268,000

Margin at p90

−€18,000

safe marginat riskloss tail

Model: cost-to-complete treated as lognormal around your estimate with the uncertainty you set. Margin = value − (spent + completion). Illustrative only — no project data leaves your browser.

If one of your projects is in that tail

The forecaster we build runs on your delivery data, with a baseline and calibration you can check, and it does this for every project at once. That is a Project margin engagement, and it starts with a Decision Opportunity Audit.